Feb1988
To
Nov 1989Juwaideh - Suwaqa Highway
This is first section of the dual-carriage highway connecting Amman To Aqaba. The Length at this section is 75 km.
The Following main items were executed
- 4 million cubic meter of unclassified excavation including blasted rock cuts.
- 1 Million Cubic meters of crushed bases.
- 30 thousand cubic meters of concrete.
- 500 linear meters of fiber reinforced concrete highway.
- 8 kilometers of drainage pipes up to 1200mm.
- 500 thousand tons of hot asphalt mix.
Value 51 Million U.S.