Jul1992
To
Jul 1996Zara Ghor Haditha Highway Project
A single 31.5 km carriageway with two lanes.
The work carried out:
- 1.3 million cubic meters hard rock excavation by blasting.
- 24 thousand cubic meters of concrete.
- Pavements and hot asphalt mix.
Value of this project 17.5 million USD.