Karak - Kutraneh Highway Sec. 1

A dual carriageway with two lanes.

The work carried out:

  • 650,000 cu.m Of Rock cut
  • 2.4 miliion Cu.m Total Earthwork 
  • 140,000 cu.m Bases
  • All Box And Pipe Culverts

    Value of this Project 7 Million USD